MOD Copehill Down - Case Study

Get in Touch

Project

MOD Copehill Down

Brief

Copehill Down, was a refurbishment project to remove the existing external facade and install a modern and fire safe system.

Value

£330,000

Solution

Commercial Rainscreen Cladding

This refurbishment project at Copehill Down, a live-firing NATO training facility, involved the complete removal of the existing external façade and the installation of a modern, fire-safe rainscreen cladding system.

The location’s sensitive nature demanded strict security compliance, minimal disruption to military activity, and full adherence to updated UK fire safety regulations following the Grenfell Tower tragedy.


Our Solution

We installed a Rockpanel Natural Stones rainscreen system in sandstone colour, chosen for both its architectural appeal and certified fire performance. Despite the site’s complexity and exposure to adverse weather, the project was completed on time and within budget—demonstrating our ability to deliver in high-security and high-risk environments.


Fire Safety Compliance

The new system was designed to meet and exceed the latest UK Building Regulations (Approved Document B) and BS 8414 fire performance tests, using fully non-combustible components, including:

Rockwool Rainscreen DuoSlab (Euroclass A-rated insulation)
Open-state Corofil 25 fire barriers (120-minute resistance)
• A fully ventilated cavity system for moisture control

This upgrade ensures long-term fire protection, regulatory compliance, and occupant safety—critical in military and government infrastructure.


Why Rockpanel Stones?

Rockpanel Stones combines the appearance of natural stone with the performance benefits of engineered basalt. It was selected for this project because of its:

✔ Euroclass A2 fire rating (non-combustible)
✔ Weather-resistant and low-maintenance finish
✔ Lightweight construction for quicker, safer install
✔ Sustainable, recyclable material credentials
✔ Visually striking sandstone colour with colour-matched rivet fixings

This allowed us to deliver both functional fire protection and an improved architectural aesthetic.


Project Challenges & Delivery

Operating within a live military zone meant tight coordination with MOD personnel and daily adaptations based on training schedules and restricted access. Security clearance procedures, strict health and safety compliance, and adverse weather on the exposed site required a flexible, well-managed approach.

Our team maintained full communication with site commanders and successfully managed complex logistics without interrupting ongoing training operations.


Technical System Breakdown

Substrate: High-density concrete block
Fixings Used: EJOT Facade Anchor SDF KB 10V
Cladding Support System: Fastframe
Insulation: Rockwool Rainscreen DuoSlab (120mm) – A-rated fire performance
Air Gap: 25mm cavity for ventilation and moisture control
Fire Barriers: Corofil Open-State Cavity Barriers – 120-minute resistance
Outer Panel: Rockpanel Stones (Sandstone Colour) with colour-matched rivet fixings


Outcome & Client Feedback

The client praised our professional delivery, the system’s quality, and our ability to meet operational demands on a complex, high-risk site. As a result, we’ve since been appointed to deliver further cladding remediation projects within the defence sector.


Need Fire-Safe Cladding for a High-Security Site?

We specialise in rainscreen cladding installations, fire compliance, and secure-site refurbishment. Whether you’re operating in defence, public sector, or high-rise residential, our experience ensures total safety, compliance, and visual excellence.

📩 Get in touch with Total Cladding and Roofing today to discuss your project requirements.

 

We offer our services throughout the UK, making sure we always hit the mark for our customers

Fully Trained Team

Our team is fully trained, giving you peace of mind that we have the right skills to perform our work to the highest standards.

Professional Service

We know that every project is a process and that’s why we’re here to deliver professional service every step of the way.

High Quality Materials

The materials we use on your roofing or cladding project will only be the highest quality available, ensuring lasting results.

Expert Surveyors

When it comes to roofing, our surveyors have the experience and the technical knowledge to ensure you get all the details as well as the proposed solutions.

Approved Installers

We are proud to be approved installers of Rust-oleum, Sika and Kingspan products and materials

Rustoleum Logo
Sika Logo
Kingspan Logo
1

Get in touch

Take the first step to improving your building by contacting our professional team.

2

Arrange a site visit

Book a site visit with our team and we can fully assess your needs and listen to your requirements.

3

Receive your quote

We’ll then present you with a quote for all the work proposed so that you can see our recommendations and prices.

4

Plan your project

Work with our professional team to plan your project to meet your requirements.

5

Begin your project

Once approved, the work can begin to bring your roof or cladding up to standard.

6

Final Handover

Once your new roof or cladding is complete, we will do a final handover to bring the project to a close.