Replace the fire-damaged asbestos-cement roof at the Stewarts Coaches / National Express facility, including damaged purlins, approximately 2,629 m² of insulated composite roofing, rooflights, insulated gutters and parapet cladding.
Solution
The Stewarts Coaches / National Express coach facility in Woodley had suffered fire damage. TCR was appointed to remove the damaged asbestos-cement roof and replace it with an insulated composite system across approximately 2,629 m².
Fire-Damaged Roof Removal
The existing asbestos-cement roof covering and internal plasterboard liner were removed under a sequenced access and safety programme. Fire-damaged purlins were removed and replaced before the new roof system was installed. Scaffolding and collective fall-protection netting supported the work across the large building.
The Insulated Roof Package
A 120 mm Trisomet composite roof system was installed across the building, together with approximately 526 m² of translucent rooflights. New flashings, seals and ridge details completed the main roof covering.
- Fire-damaged roof purlins removed and replaced
- Approximately 2,629 m² of existing roof replaced
- 120 mm insulated composite roof sheets installed
- Approximately 526 m² of rooflights incorporated
- Approximately 160 metres of insulated guttering fitted
- Approximately 230 m² of parapet cladding completed
Internal and External Finish
Inside, the light-coloured liner and regular rooflight layout create a consistent soffit beneath the renewed roof. The photographs also show the new external sheets and rooflights from above, recording the completed covering across the building.