Project
Unit 1, Cheney Manor, Swindon
Brief
Replace the asbestos-cement roof and wall coverings with an insulated metal roof, renewed roof-level cladding, gutter lining and a refurbished front flat roof.
Solution
Unit 1 on Cheney Manor Industrial Estate in Swindon underwent a substantial roof and wall refurbishment. The package replaced the existing asbestos-cement coverings and introduced an insulated metal roof, new wall sheets and renewed drainage details.
Strip and Preparation
The existing asbestos-cement roof and wall coverings were removed as part of a sequenced programme using scaffolding and collective fall-protection netting. The early works also included the access, waste handling and temporary arrangements needed for the refurbishment.
Insulated Roof and Cladding
The new roof build-up combined 0.7 mm liner and outer sheets with 240 mm insulation. New wall sheeting was installed around the roof-level elevations, with the metal covering profiled around the building’s stepped parapet line.
- Existing asbestos-cement roof and wall coverings removed
- New profiled liner and outer roof sheets installed
- 240 mm insulation incorporated into the roof build-up
- Roof-level wall cladding renewed
- Front flat roof included in the refurbishment
Gutter Lining
The main package also included a Plygene gutter-lining system, tying the new roof covering into the building’s existing rainwater route.
Project Record
The aerial photograph records the insulated roof installation, while the ground photographs show later work on the roof-level cladding around the front and side elevations.